GD&T Tutorial 24.1 : Datum

GD&T Tutorial 24.1 : Datum

Palani Kailash

4 года назад

26,559 Просмотров

Ссылки и html тэги не поддерживаются


Комментарии:

@saravanaag4629
@saravanaag4629 - 22.09.2021 10:33

Why we shouldn't. Use I,O U for datum sir?

Ответить
@roshantidke6463
@roshantidke6463 - 30.07.2021 18:40

why letter I,O & Q is not used in datum reference?

Ответить
@Saifthebest01
@Saifthebest01 - 04.02.2021 22:52

dude you are gonna save my life thank you so much

Ответить
@sweeter62
@sweeter62 - 26.01.2021 17:46

Hello Sir, I have watched all your videos & they are brilliant. It helped me understand the basics of GD&T. Can do you a video on (hole to hole) and (hole to slot) datum strategy? I work for a sheet metal company & they tend to use this a lot.

Ответить
@jackreacher7183
@jackreacher7183 - 14.05.2020 13:47

I keep on watching you all videos. You are doing are a great job at free of cost.

Ответить
@nabeelnisar1478
@nabeelnisar1478 - 12.05.2020 15:38

very informative

Ответить
@user-vl8dy1os6r
@user-vl8dy1os6r - 29.03.2020 02:34

你好

Ответить
@uve_viktor_doom
@uve_viktor_doom - 29.03.2020 01:54

Hallo Palani, I have a question: I have seen in some drawings that the datum A is composed of 5 points in diferent heights, so as you know, only 3 points are necessary and always the 3 "highest" will at the end be the "plane" where a solid part will rest (not flimsy), so what about the virtual condition of the plane formed with more than 3 points, should that be calculated like a sort of "average"? or the maximum limits are the ones to be taken? (question for measuring in CMM purposes)

Thanks for your Videos!

Ответить