Комментарии:
Does anyone know how you would do an insulation resistance test on this? I failed this on my AM2
ОтветитьAre all the terminals between the isolator and the top of the contactor already done? And is the sy cable already pre made up of is that something you have to run yourself.
ОтветитьDo you have to sleeve the L2and L3 with brown at all? Also the grey sleeve with blue?
ОтветитьExcellent teaching.
ОтветитьThe cable coming out of the remote switch is left out for your assessment.....am I right in saying it needs to be terminated into terminal 96
ОтветитьThe clearest explanation I have seen for this. Many thanks 👍
ОтветитьHi, is this rig similar to the actual am2 rig that is used in the prep courses and exam?
Ответитьdoes the load side not need a neutral ?
ОтветитьHi
I just wanted to know about the socket for load side: is it a spur/fused spur? or it's just a socket for motor? and what is the termination look like? I can not see the full picture for termination may be its not close enough? I do not know. Even though I had all the videos but there was not any termination for the load end?
thanks
I just recently passed my am2s assessment and want to say thanks. Your videos were very helpful in my preparation.
Ответитьhold up a second... i swear this guy used to work as a tutor in leeds. pretty sure he tought me in my first year
ОтветитьJust wanted to say a big thank you for your videos, I found these invaluable for preparation for my AM2 which I was extremely nervous about. I'm happy to say I passed first time. Thanks again guys!
ОтветитьYour left elbow is practically touching the 3 phase incoming supply
ОтветитьIs the plastic cable tie OK, or should they now be metal ties to comply with regs?
ОтветитьHhh that is exactly test centre of Am2. Make sure NET doesn't know about this video because you will put yourself in trouble mate.
ОтветитьIs there any reason why all line cores of SY cable have been sleeved with brown, if I see correctly, rather than with brown, black and grey (for 3 phase)?
ОтветитьCan you please show the full installation I mean final installation....how it all look
ОтветитьDo we have to terminate and 2nd fix the sy cable? Or would that be pre wired already?
ОтветитьAdd more video for other circuit and Risk assessment for am2
Ответить