The installation video of PU sandwich wall panel

The installation video of PU sandwich wall panel

BRDECO

7 лет назад

34,366 Просмотров

Website: www.brdecogroup.com

1, First of all, it must carry on the construction preparation before installation, include personnel, materials, etc. All will be well prepared.
2, Before the installation of polyurethane wall panel, it should check whether the verticality and levelness of metope purlin installation requirements, wall frame column vertical degree meets the requirement.
3, Before installation polyurethane wall panel, it should first mounting plate bottom water retaining plate and the bottom of the window to block water board, water retaining plate and wall frame beam connection with self tapping screw fixation.
4, Polyurethane wall panel links with ground.
Lateral links: fixed polyurethane sandwich panel with the ground at the other end of the round hole with steel frame fixed, connection between the two plate mouth involution, if occurrence crack of the connectors available heat preservation to fill.
Vertical links: the gap between plates, using the dedicated button concave groove in the fixed polyurethane wall panel.

Тэги:

#pu_sandwich_panel #sandwich_panel #sandwich_wall_panel #insulated_sandwich_panel
Ссылки и html тэги не поддерживаются


Комментарии: