The fifth year of the Bear Tree Ridge garden railroad got off to a difficult start. Godzilla sized elk destroyed the power house and railroad control center, ending season 4 earlier then scheduled. Control system failures fatigued the scheduled start of season 5 until the troubleshooting team determined the cause, and remedied the problem.
-H-Bridge was fried in one polarity direction.
-Trying the 5W solar panel this season to compare it to the 50W solar panel.