Installing or Repairing Lead Front Apron Roof Flashing

Installing or Repairing Lead Front Apron Roof Flashing

Dave Salter

2 года назад

28,219 Просмотров

Ссылки и html тэги не поддерживаются


Комментарии:

leo hughes
leo hughes - 09.08.2023 00:27

Video was very helpful 💯👍🏻

Ответить
J G
J G - 06.02.2023 00:43

Excellent video

Ответить
TheToolnut
TheToolnut - 25.09.2022 01:23

Your lead should be 2" into the joint between those bricks. There's a diamond chasing disk available for an angle grinder which works very well. A coat of Patination oil works wonders on lead as well, 👍🔨🇮🇪

Ответить
Peaky_Blinder
Peaky_Blinder - 23.07.2022 22:46

25mm fukwit

Ответить
Otto Fumbler
Otto Fumbler - 14.06.2022 02:54

Good job, well shot video. Any tips on how lift lead flashing without tearing? I've got to reduce the height of the overflow in a code 5 lead flashing lined gutter box (flat roof), and wanted to avoid having to replace a section of flashing, as it's only 18 months old. Should I apply heat first to get to the brick underneath?

Ответить
Dave Wheeler
Dave Wheeler - 13.05.2022 23:06

Looks amazing.

Ответить